The Long-Term Vision - Southern Section
The Greenway starts at the Tower Road parking lot in Point Pleasant Park and goes along Francklyn Street to the bottom of Pine Hill Drive, then across a new pedestrian bridge across the rail cut to the back of the Oaks at Saint Mary's University. A second approach to the bridge runs down Pine Hill Drive from the corner of Tower Road.
The multi-use trail runs parallel to the rail cut to Roxton Road. Nature footpaths run to Roxton Road/Marlborough Woods on either side of the rail cut.
The existing Halifax Urban Greenway - Phase One runs the length of Beaufort Avenue from Roxton Road/Marlborough Woods to South Street. A nature footpath will parallel the trail wherever possible.
The multi-use trail crosses to the other side of the rail cut between South Street and Coburg Road. It crosses again at Coburg Road to go through Conrose Park.
After going through Conrose PArk, the multi-use trail crosses to the other side of the rail cut through to Prince Arthur Street, which it crosses.
Overview of long-term vision for Greenway.
Detailed maps of northern section.